A lack of places in nurseries and crèches provided the impetus for building an early childhood educational and childcare facility in Freiburg-Betzenhausen. Since 2014, around 90 children have been playing and capering on a total area of 1600 m² divided between two floors. In order to meet the high demands made of the exposed concrete columns in the interior area, H-BAU Technik supplied shuttering tubes with the innovative RAPIDOBAT® Cretcon HD coating. This gives the 35 reinforced concrete columns a notable shine and brings the highest quality of visible concrete into the new early childhood educational and childcare facility.
Architect
Stocker Dewes Architekten
Builder
Stadt Freiburg im Breisgau, Gebäudemanagement Freiburg
Construction Period
2014